Preventing Costly Field Conflicts
#1
Thread Starter
FitDay Member
Joined: Feb 2010
Posts: 1,050
What specific types of unmitigated design risks, which often surface during construction as expensive change orders, can be identified and resolved by integrating a constructability review early into the design development process?
#2
FitDay Member
Joined: Mar 2024
Posts: 102
Based on the page, integrating a constructability review early can identify specific unmitigated design risks that typically lead to expensive change orders. These include physical clashes between systems like structural and MEP that result from siloed collaboration, and incomplete documentation caused by a narrow focus on permits rather than construction details. As https://www.fields-builds.com/optstruction explains, resolving these issues on paper before construction begins prevents them from becoming costly real-world problems.